Ashok Leyland Improved ROI by 70%

Ashok Leyland, headquartered in Chennai, is a leading Indian multinational automotive manufacturer. It ranks as the second-largest commercial vehicle manufacturer in India, the third-largest bus manufacturer globally, and the tenth-largest truck manufacturer worldwide. The company operates seven factories in India and has two overseas plants in the UAE and the UK.
The Problem
Ashok Leyland's engine production process required operators to manually push heavy engines, weighing up to 400 kg, on trolleys from the test cell to the dressing area. The test cell is the section of the factory where each engine undergoes rigorous testing to ensure it meets performance and safety standards before proceeding to the next stage. Once testing is completed, the engines are moved to the dressing area, where final fittings and assembly work take place before they are prepared for delivery.
This task involved multiple operators, creating ergonomic challenges and safety risks. Additionally, engines were not promptly picked up once ready from the test cell, which created bottlenecks at the dressing cell and delayed the delivery timelines. The client sought an automation solution that could efficiently and safely transport the engines, working seamlessly alongside human operators to eliminate delays and improve operational efficiency.
Our Solution
Fleet of 3 MAG300 Lifters to Automate Engine Transfer
Botsync designed a solution that utilized 3 MAG300 Lifters alongside a custom designed call panel system. The call panels were designed to let the operators confirm whenever an engine is ready for pickup. The system which was integrated with SyncOS™ would then automatically assign the most suitable MAG300 AMR to pick up the engine and transport it to the dressing area for further processing.
In parallel, SyncOS™ would also instruct the MAG fleet to deliver an empty trolley to the original pick up point to ensure that the operators are able to continue their operations without any downtime.
Key Features
MAG Fleet Integrated with Call Panels
The SyncOS™ Integrator was used to integrate the MAG300 Lifter fleet with the call panels placed across the facility. This made it intuitive for users to assign tasks to the AMR fleet without worrying about system complexities.
Agile and Easily Configurable
The MAG300 does not require any infrastructural sensors such as tape or QR code for its navigation. This made it very easy for the user to reconfigure or add new workflows as needed.
Intuitive User Interface
With SyncOS™'s simple UI design, users are able to easily add new tasks and resolve errors independently, without waiting for technicians.
Integrated with Remote Support
With support from our customer, we were able to integrate the deployed solution with our remote monitoring system. This allows our team to proactively monitor the operation for any errors and resolve them as soon as they come up, thereby ensuring that uptime of operations is always above 99%.
Impact On Operations
- 1
Reduced waiting time for engines by 1%, which allowed the facility to increase their monthly output by 2-3 engines.
- 2
Improved overall safety of operations by reducing the risk of accidents such as engine fall which could potentially injure operators.
- 3
System reduced physically strenuous tasks for operators, contributing to a safer and healthier work environment.