Global automaker improves productivity by 12.5% with MAG Lifter Solution

The Problem

A global automaker had been facing labor shortage issues which was affecting their ability to maintain productivity. To alleviate such labor constraints, they had started exploring AMR solutions to take over certain intralogistics processes in their body shop process.

However, since the processes in question are mission-critical, they were concerned about whether an AMR system could meet their performance requirements.

Our Solution

How SyncOS ensured a successful deployment

SyncOS was able to track the status of the different systems involved in the automation process (AMRs, call panels, assembly line) and then intelligently assign tasks to the MAG AMRs to ensure optimum productivity. This was critical in achieving the 12.5% productivity improvement

Key Features

Cycle time mapping

We mapped assembly line operations to the AMR process in detail to ensure timely delivery of parts to the lineside and avoid any production downtime.

Operator <> AMR interaction

We reduced usage complexity for the assembly & forklift operators by translating the interface to Thai and reducing the number of steps to just 1 or 2 clicks.

Intuitive User Interface

With SyncOS™'s simple UI design, users are able to easily add new tasks and resolve errors independently, without waiting for technicians.

Ensuring high uptime

We defined the process and integrations clearly to ensure a 99%+ uptime.

Impact On Operations

  • 1

    Increased production capacity by 12.5%, from 28 to 32 JPH, ensuring higher throughput.

  • 2

    Maintained 99.4% uptime, supporting uninterrupted operations for over 24 months.

  • 3

    Delivered over 1 million parts to the lineside with 193,000 production trips, ensuring timely assembly line support.

  • 4

    Simplified operator interactions with localized interfaces, reducing steps to just 1–2 clicks for ease of use.

  • 5

    Reallocated 1 forklift and 2 operators, optimizing labor resources.

  • 6

    Achieved ROI in under 2 years, making the AMR solution highly cost-effective.